Commissioning of a Bitumen Emulsion Unit in Myanmar

In July 2018, a GlobeCore UVB-1 unit was commissioned in Myanmar. Beside the commissioning, GlobeCore engineers also trained customer personnel to operate and service the unit.

The unit produces 8 cubic meters of emulsion per hour; it consists of a water phase section, emulsion preparation section, controls and piping to supply water phase solution and thinner. The unit is semi-automated.

Bitumen emulsion made with the UVB-1 units complies with international standards of quality and can be used for surface treatment of road top, preparation of cold asphalt mix, patch repairs of roads, tac coating before application of asphalt etc.

For more information on the unit and to place an order, visit the contacts page of our website.